Our projects reflect a steady commitment to quality civil works, combining practical experience with technical skill across complex infrastructure.
Earthwork of Soil, Soft Rock & Hard Rock for the Execution of Spillway & Approach Channel.
Earth Works including Excavation of 2,19,680 cum (Rock & Soil) and Embankment of 1,38,369 cum
Excavation Works and Foundation for Dam, Power House and Miscellaneous Works
Scope includes Finished Pump House, Surge Pool, 3 No.s Pressure Shafts, 3 No.s Draft Tubes, Lined Horse-Shoe Shaped Tunnel, Intake Excavation, Delivery Cistern with Thrust Blocks, Gravity Canal and other Miscellaneous Works
Cumulative Excavation Work of 1,27,905 cum below 60 m of Depth for Surge Pool, Draft Tubes at the Bottom of Pit, Tunnel Portal with Rock Bolting and Anchoring with Concreting along with Fabrication & Erection of 1,147 MT of Steel Structures.
Excavation of 1,22,281 cum to a depth 60 m in Hard Rock for Pump House & Surge Pool with 30.7 m Draft Tube having 7.311 x 4.789 sqm Cross-Section along with Anchoring, Rock Bolting, Fabrication & Erection of 1,147 MT of Steel Structures
Provision of Civil Works and Allied Services
Civil Works
Provision of Civil Works and Allied Services for Office and Residential Accommodation for Missiles and Strategic Systems (MSS) at DRDL Campus
Excavation, Strutting (including Fabrication) & Decking (with Bracings) Works at Central Secretariat Station (M10), Chawri Bazar Station. Strutting (including Fabrication) & Decking (with Bracings) and Cut & Cover for Tunnel C-8 (272 m), M10 (294.80 m)& C7 (225 m) Areas.
Top-Down & Bottom-Up Excavation including Construction of Soldier Piles, Steel Struts, Columns & Excavation, Backfilling including Retrieval of Struts & Soldier Piles for Green Park Underground Station including Approach Tunnels by Cut & Cover Method in Line 2 of Phase-II of Delhi MRTS Project
Execution of Major Bridge Works Nos. 492, 493, 495, 502, 503, 508, 511, 518 & 577 in Villupuram – Mayiladuthurai Section
Construction of a 1040 m Long, 3 Lane Width & 34 x 30.615 m (avg.) Span Bridge with Pile Foundations of 4387 m, PSC Girder Super Structure and Circular Pier Sub- Structure as part of GPL’s Four Laning of Hyderabad-Karimnagar-Ramagundam Road (SH-1) Project
Construction of Viaduct 01 from Chainage Km 623.71 to 624.625
Construction of 2 Major River Bridges at KM 294+450 and KM 295+575
Demolition of Concrete Lining and Enlarging of Tunnel Cross-Section of 2.6 km, 30 m below Surface. Along with Excavation of a 30 m Shaft and Widening of 2 existing Shafts.
Construction of Intake Tunnel, De-mineration Plant, Filtration & Chlorination Plant, Over Head Domestic Water Tank & Miscellaneous Works for Nuclear Power Corporation India Limited
Drilling & Blasting for a quantity of 10,000 MT with over 1,00,000 RM of 4.5 Inch Blast Holes with Crawler Machines for Quarry Operations.
Sinking and Lining of 2 Shafts of 8m Dia. and 120m Depth, used by Indian Strategic Petroleum Reserves Limited